Unsaved changes

Your changes have not been saved. Leave this page and discard them?

Skip to main content
oyopo

Buying a Used House in Thailand

Buying a used house in Thailand: price the defects you can explain

The seller has offered ฿80,000 off because the kitchen needs work. At the viewing the kitchen looks dated but functions. Outside, the ground has been raised against the back wall and there is a stain beneath a window. You can price a new kitchen from a drawing. The stain might be a smaller repair or the start of a problem that needs the wall, drain and outside levels investigated together. Decide which kind of number you are negotiating before talking about a discount.

Reviewed 6 min read

A weathered exterior wall and downpipe beside a terrace.
The paving and downpipe can help an inspector work out where the water behind a stained finish came from.

Put each issue into one of three groups

Some work can be planned for after moving in. Faded finishes or an inconvenient cabinet arrangement are easy to describe, and a contractor can quote them without knowing much about the rest of the house. A second group affects how soon you can use the house: leaking plumbing, an unsafe installation identified by an inspector, or a bedroom you cannot occupy until a leak is fixed. A third group needs evidence before you can even define the work. Movement, repeated damp and an addition with missing records belong here until an appropriate professional has reviewed them.

Record the symptom and its location rather than naming the cause yourself. “The rear bedroom skirting has swollen on the wall shared with the bathroom” gives somebody a place to start. “Rising damp” already commits to an explanation the visit may not support. Ask permission before operating fixtures or accessing service areas, and leave roof, structural and electrical investigations to qualified professionals.

Trace the stain before pricing the finish

Observe what sits above, behind and below it. A mark high on a wall might correspond to a roof junction or upper window; a mark that starts below a bathroom might track a pipe or outlet. Compare exposed elevations with sheltered ones. Outside, look at changes in ground level, paving that slopes towards the wall, downpipes with no clear outlet and the position of any neighbouring drain. At the second viewing the useful question is what changed after normal use or rain. A recently repainted surface may hide the history, so compare dated photographs, repair invoices and the account of whoever undertook the work.

A damp or cracked wall can have more than one cause. Ask the inspector to state what can be seen, which cause is plausible, where access is limited and what follow-up would reduce uncertainty. The flood-risk guide is useful when the symptom might relate to a past event affecting the road or plot as well as the house. To price a moisture repair, get the source, drying and reinstatement in the scope. Repainting and replacing joinery are different costs from correcting the cause.

Read the roof and additions as changes to the building

A new carport or an enclosed terrace can be useful without being part of the original design. Compare the property with the available approved plans and the seller’s records. Try to establish when each substantial addition was built and which approvals or other procedures applied. The Building Control Act published by Bangkok’s public service portal addresses alterations and enforcement. Ask the authority serving the property and independent Thai counsel to assess the actual work. A tax receipt, dated photograph or assertion about a neighbour’s house does not settle the legal status of the addition.

Give the inspection a dated plan of the rooms, roof and additions. A junction between an older house and a later extension is where two different structures, roof heights and drainage systems often meet. Ask who built it and whether the roof, rainwater or electrical routes were altered. Where cracking or movement raises a structural question, get an engineer to explain what investigation is required. Keep the title and boundary enquiry separate: even sound work can create a problem if its position overlaps adjacent land or an access strip.

Build two budgets before you bargain

Use the same categories for each house. Put the immediate scope and timing next to the known price. Keep investigations and provisional allowances visible. These figures are invented to show how to reason about a quote, not estimates for Thailand.

If the kitchen is deferred, the known immediate cost in that example starts at ฿35,000. Add the ฿12,000 investigation and provisional wall scenarios and it becomes ฿87,000–฿227,000, excluding the unresolved terrace and other costs. The range shows what the unknown could do to the offer. It is useful only if the eventual quote covers the same work. Record whether it includes opening up, drying, reinstatement, exclusions and any time the house cannot be occupied.

Build two budgets before you bargain
FindingPrice or next actionWhen it affects the decision
Worn kitchen that still works฿110,000 quoted for a defined replacementCan wait until after moving if the existing kitchen is usable
Verified local pipe leak฿35,000 for repair and specified reinstatementInclude before occupation if the affected area cannot be used
Rear wall wet after rain฿12,000 for investigation, with a provisional ฿40,000–฿180,000 repair scenarioClarify cause and written scope before relying on a discount
Enclosed terrace missing from documentsRequest plans and have the authority and lawyer review itResolve before assigning the extra room full value

Decide what has to be true before money changes hands

The negotiation can end with a lower price, completed work or a condition you need settled before committing. If the seller is to fix something, set out the agreed scope and how the result will be verified. If your offer depends on clarifying the addition or a serious defect, agree the evidence, deadline and deposit treatment with counsel. The deposit guide shows how to turn an unresolved fact into a condition that both sides can identify.

Bring the inspection back to your first-week plans. What work must happen before you can sleep, cook or use the property safely? What can you leave for next year? If the discount helps with both, it may be a good deal. If it only pays for a kitchen while the cause of the damp is still unknown, the next appointment is with the inspector.

How this guide was prepared

oyopo prepared this buying guide using the linked records and guidance. Illustrative properties and figures are identified in the text. For an actual purchase, use the documents, measurements and professional advice for that address.

Sources and further reading