oyopo

Mérida · Mexico

Torre Mitos

Torre Mitos is an apartment tower within Vía Montejo in Mérida. A curved façade and upper-level shared spaces give the project an architectural identity within a broader district of homes, shops and workplaces.

Storeys
19 floors

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The developer groups the residential amenity programme around level 19. It includes dedicated work and study areas alongside recreation and social spaces, giving the building a more specific residential programme than a generic apartment tower. The pre-sale label does not establish physical completion.

The project at a glance

Key project facts

Developer
Inmobilia
Location
Mérida
Neighbourhood
Vía Montejo
Property types
Apartments / condominiums
Storeys
19 floors
Residences
125
Announced completion
Completion date not confirmed in the reviewed developer page

Planned amenities

  • Swimming pool
  • Gym
  • Padel court
  • Residents’ lounge and multipurpose room
  • Work and study spaces
  • Concierge

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Torre Mitos is part of Vía Montejo in Mérida. Residential facilities are distinguished from the wider mixed-use district.

Development

Progress & timeline

Unknown

The developer lists pre-sale, 125 apartments and 19 floors. Physical progress is not established by that sales label; no completion year is invented. A questionable site-area figure is deliberately omitted.

Completion date not confirmed in the reviewed developer page

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Inmobilia

Sources & updates

Last checked: October 17, 2026

Official project/developer material reviewed on 15 October 2026. Physical progress, sales status and occupancy are distinguished in the progress note. Approximate project-area point from the developer’s project-specific structured location data or embedded map, reviewed 17 October 2026; not a surveyed entrance. Additional project facts and cited source documents reviewed on 17 October 2026; advertised plans do not establish current availability.