oyopo

Singapore

Midtown Bay

Midtown Bay is the 219-home residential tower within Guoco Midtown on Beach Road. The 33-storey building offers one- and two-bedroom apartments alongside two- and three-bedroom duplexes, with published plans spanning 38–123 m².

Storeys
33-storey residential tower (developer release)
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The tower’s own pool garden, fitness area and level-25 terraces are complemented by the wider integrated development’s gardens, dining and business facilities. Network Hub is a separate club building within Guoco Midtown; its shared facilities are not presented as additional floors or private rooms within Midtown Bay.

The project at a glance

Key project facts

Location
Singapore
Neighbourhood
Beach Road / Bugis
Property types
One- and two-bedroom apartments; two- and three-bedroom duplexes
Storeys
33-storey residential tower (developer release)
Residences
219 residences
Unit sizes
38–123 m² across the published apartment and duplex plans
Announced completion
Completed in Q2 2024, according to GuocoLand’s 1H FY2026 results

Amenities & shared spaces

  • Residents’ pool garden and fitness area
  • Landscaped garden courts
  • Level-25 sky terraces
  • Access to the separate Network Hub business and social facilities

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

122 Beach Road, Singapore 189770, in the Bugis / Beach Road district. The named Midtown Bay residential footprint is used for the approximate point, separate from Guoco Midtown’s office address and the unrelated Midtown Modern residential project.

Development

Progress & timeline

Completed

GuocoLand’s 1H FY2026 results release identifies Midtown Bay as completed in the second quarter of 2024. This establishes the developer-reported completion period, not the date of every private apartment handover. Older launch targets are not presented as the actual completion year.

Completed in Q2 2024, according to GuocoLand’s 1H FY2026 results

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

GuocoLand and joint-venture partners

Sources & updates

Last checked: October 17, 2026

Official project site, its floor-plan and amenities pages, original developer launch release and 1H FY2026 results reviewed on 17 October 2026. Completion is reported for Midtown Bay specifically, not inferred from the office tower or Midtown Modern. Approximate named-building location from OpenStreetMap, matched to 122 Beach Road.