Bangkok · Thailand

RHYTHM Charoennakhon Iconic

RHYTHM Charoennakhon Iconic is a 29-storey condominium on Charoen Nakhon Road, across from ICONSIAM. AP Thailand and Mitsubishi Estate developed the project as a joint venture.

Storeys
One residential building, 29 storeys
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

Its 577 residences are offered in simplex and double-volume configurations, with a separate shop excluded from the residential total. Shared amenities include a saltwater pool, residents’ lounges and gym facilities, with further communal spaces on the upper levels. The Khlong Ton Sai location places the project beside Bangkok’s river-oriented shopping and transport district.

The project at a glance

Key project facts

Location
Bangkok
Neighbourhood
Charoen Nakhon Road / Khlong Ton Sai, Khlong San
Property types
Simplex and double-volume condominium layouts
Storeys
One residential building, 29 storeys
Residences
577 residences; 1 shop separately listed
Land area
Approx. 6,746 m²
Unit sizes
35–130 m²
Announced completion
Completed by August 2026, according to AP Thailand

Amenities & shared spaces

  • Saltwater swimming pool
  • Residents’ lounges
  • Gym
  • Rooftop communal spaces
  • Landscaped communal areas

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

AP lists Charoen Nakhon BTS approximately 100 metres away, ICONSIAM approximately 130 metres away and Khlong San Pier approximately 400 metres away. These are developer distances, not independently measured walking routes.

Development

Progress & timeline

Completed

AP’s 24 August 2026 release confirms completion and the opening of ownership transfers in August. The project’s progress data, updated on 11 September 2026, also reports 100% overall completion. These are developer statements, not an independent building inspection.

Completed by August 2026, according to AP Thailand

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

AP Thailand / Mitsubishi Estate joint venture

Sources & updates

Last checked: October 17, 2026

AP project details, project-map point and completion release dated 24 August 2026 reviewed on 17 October 2026. The progress entry was updated on 11 September 2026. The map uses the project location rather than the sales gallery. Site area converted to m².