Dubai · UAE

Albero

Albero combines apartments and three-bedroom townhouses within the Greengate area of Dubai Creek Harbour. Emaar’s H1 2026 register identifies 479 homes for this development, separate from the larger waterfront district.

Storeys
Developer section labels: B + G + 3 podium levels + floors 1–53; not a summed physical storey count
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The published amenity programme includes an infinity pool, fitness and yoga areas, children’s play spaces and a multipurpose room. Community planting and barbecue areas provide outdoor meeting places; the broader Greengate parks and public recreation routes belong to the surrounding neighbourhood.

The project at a glance

Key project facts

Location
Dubai
Neighbourhood
Greengate / Dubai Creek Harbour
Property types
One- to three-bedroom apartments and three-bedroom townhouses
Storeys
Developer section labels: B + G + 3 podium levels + floors 1–53; not a summed physical storey count
Residences
479 homes (Emaar H1 2026 register)
Unit sizes
One-bedroom examples: 60.90–61.18 m² suite plus 9.19 m² balcony, 70.09–70.37 m² total; not the full project range
Announced completion
Current handover date not verified; dated construction progress shown below

Planned amenities

  • Infinity swimming pool and deck
  • Gym and outdoor fitness areas
  • Yoga spaces
  • Children’s play area
  • Barbecue and picnic areas
  • Multipurpose room and community garden

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Dubai Creek Harbour. Approximate project-area point from the developer’s project-specific map. Planned transport links and neighbourhood facilities are not represented as already delivered residential amenities.

Development

Progress & timeline

Under construction

Emaar’s H1 2026 investor presentation reports 13% construction completion as of June 2026 for 479 homes. This is the completion column, separate from the units-sold figure. It is not an October 2026 site measurement, individual handover confirmation or forecast of a specific completion day.

Current handover date not verified; dated construction progress shown below

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Emaar Properties

Sources & updates

Last checked: October 17, 2026

Project page, original brochure and Emaar’s H1 2026 investor presentation reviewed on 17 October 2026. Unit count and construction progress refer to the named project row on page 66. Approximate location uses the project-specific map label and coordinates, not a sales pavilion or masterplan centre. Large district land-area figures are not assigned to this project. The linked original floor plan separates suite and balcony areas.