oyopo

Singapore

River Modern

River Modern is a 455-home development on River Valley Green beside the Singapore River and Kim Seng Park. GuocoLand’s design combines two 36-storey towers with ground-floor shops and two- to four-bedroom apartments.

Storeys
Two 36-storey residential towers
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The site covers 11,736 m².

The residential programme includes a 50-metre swimming pool, tennis court, gym and clubhouse, together with a landscaped nature trail. Direct links to Great World MRT station and shopping mall form part of the development plan.

The project at a glance

Key project facts

Developer
GuocoLand
Location
Singapore
Neighbourhood
River Valley / River Valley Green
Property types
Two- to four-bedroom apartments with ground-floor retail
Storeys
Two 36-storey residential towers
Residences
455 apartments
Land area
11,736 m²
Unit sizes
Approximately 50–170 m²
Announced completion
2030 (developer forecast, August 2026)

Planned amenities

  • Planned 50 m swimming pool
  • Planned tennis court
  • Planned gym
  • Planned clubhouse and function rooms
  • Planned landscaped nature trail

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

River Valley Green, beside Kim Seng Park and the Singapore River. Named OpenStreetMap construction site matched to GuocoLand’s site description; approximate development-area centre, not the sales gallery or a surveyed entrance.

Development

Progress & timeline

Under construction

GuocoLand’s August 2026 results describe its newly launched residential developments, including River Modern, as progressing through construction. Completion is forecast for 2030. No project-specific physical completion percentage is published in the reviewed results.

2030 (developer forecast, August 2026)

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

GuocoLand

Sources & updates

Last checked: October 17, 2026

GuocoLand February/March 2026 launch documents supply design, sizes and facilities; FY2026 results dated 28 August 2026 include River Modern among developments progressing through construction and forecast completion in 2030. February estimated TOP was 2H2030; August table says 1H2030. The year is retained without guaranteeing a handover half-year. Named OSM site checked on 17 October 2026.