Form follows daylight
Cuts in the building volumes respond to sunlight reaching the square. The shape is linked to conditions at street level.
Rotterdam · Netherlands
Carved tower volumes make room for daylight near Rotterdam’s central station. The Modernist connects its residential skyline with the public space below.
Researched by oyopo · Last checked: October 19, 2026
The architectural story
The missing corners of The Modernist’s towers have a purpose: they help sunlight reach the public space below. MVRDV shaped the two residential towers in response to Rotterdam’s high-rise daylight rules, creating distinctive “sun cuts” above a mixed-use base. Opposite Central Station, Maarsen Groep’s development combines 421 apartments with offices and a public passage to the Weenapoint courtyard. The approximately 70- and 125-metre towers are under construction, with completion targeted for the end of 2028.
Cuts in the building volumes respond to sunlight reaching the square. The shape is linked to conditions at street level.
The 125- and 70-metre towers introduce two scales to the development. Their composition relates the taller elements to the city around them.
Passages and openings are part of the architectural story. The project addresses movement through the site as well as the homes above.
The project at a glance
These facilities are described in the project presentation. Please check their current status with the provider.
The setting
Kruisplein / Weenapoint in Rotterdam Central District, directly opposite Rotterdam Central Station. The architect’s project-map point identifies the approximate development site; the official project location page corroborates the station-side setting. Not a surveyed building entrance or an apartment position.
Development
Under construction. Stebru’s Information Bulletin 09, dated 21 July 2026, records dated structural milestones for both towers. The official project site also documents a visit to the active construction site on 29 September 2026. These establish ongoing work, not a current overall completion percentage. The ceremonial launch in December 2024, demolition and main construction from 2025 are distinct stages. Completion remains targeted for Q4 2028.
End of 2028 target; individual handovers not verifiedThis is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.
Explore the architecture. Consider the possibilities.
For current availability, prices and handover details, contact the project provider directly.
Maarsen Groep
Last checked: October 19, 2026
Reviewed 19 October 2026. MVRDV documents 421 homes, 70/125 m tower heights, 45–120 m² apartment range and the daylight-driven sun cuts. The developer’s September 2026 construction updates corroborate ongoing works; its project timeline targets Q4 2028. Bulletin 09 is dated 21 July, although its download is labelled 23 July. No current availability or overall completion percentage is asserted.