South Holland · Rotterdam Central District / Kruisplein

The Modernist

The Modernist is a mixed-use development opposite Rotterdam Central Station, forming the final phase of Maarsen Groep’s Weenapoint redevelopment. MVRDV designed two residential towers, approximately 70 and 125 metres high, above a commercial and office base. The programme contains 421 apartments, including 88 owner-occupied homes. A public passage is designed to connect Kruisplein with the courtyard behind the building. Stebru is the main contractor, with completion targeted for the end of 2028.

Under construction

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
Maarsen Groep
Location
Rotterdam
Property types
Apartments, offices and ground-level commercial spaces
Storeys
Not yet verified
Residences
421 apartments, including 88 owner-occupied homes
Land area
Not yet verified
Unit sizes
45–120 m² in the architect’s project description
Announced completion
End of 2028 target; individual handovers not verified

Planned amenities

  • Planned public passage to the Weenapoint courtyard
  • Planned ground-level café, restaurants and commercial spaces
  • Planned bicycle storage and resident outdoor spaces

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

The Modernist

Rotterdam

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Kruisplein / Weenapoint in Rotterdam Central District, directly opposite Rotterdam Central Station. The architect’s project-map point identifies the approximate development site; the official project location page corroborates the station-side setting. Not a surveyed building entrance or an apartment position.

03 · Development

Progress & timeline

Under construction

Under construction. Stebru’s Information Bulletin 09, dated 21 July 2026, reports concrete walls rising on the third floor of the north tower and construction of the fourth-floor slab at the south tower. These are dated floor-specific milestones, not an October 2026 measurement or overall completion percentage. The ceremonial start in December 2024 and subsequent demolition, piling and structural work are distinct stages.

End of 2028 target; individual handovers not verified

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.