Sunway Velocity TWO — Phase 1

Sunway Velocity TWO Phase 1 is a completed mixed-use development in Cheras, Kuala Lumpur. Sunway’s June 2026 report describes 872 serviced apartments in two 53-storey towers across a site of approximately 16,200 m². The published apartment sizes convert to approximately 59–119 m². Resident facilities include swimming pools, a rooftop sky garden, a community kitchen and a gym. The wider Sunway Velocity district provides retail, transport and healthcare connections. This profile covers Phase 1 rather than the full multi-phase Velocity TWO programme or the separate Velocity 3 project.

Completed

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Location
Kuala Lumpur
Property types
Serviced apartments within a mixed-use development
Storeys
Two 53-storey residential towers
Residences
872 serviced apartments in Phase 1
Land area
Approximately 16,200 m² for the reported Phase 1 development
Unit sizes
Approximately 59–119 m² (advertised areas)
Announced completion
Phase 1 completion documented by the developer in June 2026; exact handover day not stated

Planned amenities

  • Swimming pools
  • Rooftop sky garden
  • Residents’ community kitchen
  • Gym

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

Sunway Velocity TWO — Phase 1

Kuala Lumpur

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Cheras / Maluri, Kuala Lumpur, in the Sunway Velocity district. The named OSM Sunway Velocity Two site is matched to the official project location and developer’s Kuala Lumpur description. Approximate wider-site marker, not an individual Phase 1 tower entrance.

03 · Development

Progress & timeline

Completed

Sunway’s report dated 12 June 2026 describes Phase 1 as a completed development and documents its resident facilities. The separate corporate past-project page lists 2024 for Velocity TWO generally; that year is not assigned to an individual phase without a phase-specific handover record.

Phase 1 completion documented by the developer in June 2026; exact handover day not stated

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.