Bangkok · Wat Arun / Bangkok Yai / Wang Doem Road
ASPIRE Itsaraphap Station
ASPIRE Itsaraphap Station is a completed low-rise condominium development on Wang Doem Road in Bangkok Yai. Its two buildings contain 270 apartments and one separate commercial unit. Building A has five storeys and Building B has eight. The apartment mix extends from studios to two-bedroom homes, with published areas of 25.5–57.5 m². The brochure describes a swimming pool, gym, sky lounge, co-working area, meeting room and sky garden. AP places the development approximately 350 metres from MRT Itsaraphap. Its dated construction update records overall completion, while the current project information classifies the development as ready to move in.
01 · The project
Key project facts
- Developer
- AP Thailand
- Location
- Bangkok
- Property types
- Studio, one-bedroom, one-bedroom-plus and two-bedroom apartments
- Storeys
- Building A: 5 storeys; Building B: 8 storeys
- Residences
- 270 apartments and one separate commercial unit
- Land area
- Approximately 5,173 m²
- Unit sizes
- Studios: 25.5 m²; one-bedroom: 28–32 m²; one-bedroom-plus: 35–40 m²; two-bedroom: 47.5–57.5 m²
- Announced completion
- Developer reports 100% overall progress; update 2026-03-24
Planned amenities
- Swimming pool
- Gym
- Sky lounge
- Co-working space and meeting room
- Sky garden
From the project presentation; not confirmation that facilities are already usable.
02 · The location
Location & surroundings
ASPIRE Itsaraphap Station
Bangkok
Loading sends connection data to OpenFreeMap.Wang Doem Road, Wat Arun, Bangkok Yai, Bangkok. AP reports approximately 350 metres to MRT Itsaraphap. The project-specific official marker matches the brochure’s Wang Doem / Itsaraphap location plan; approximate site location, not a surveyed entrance.
03 · Development
Progress & timeline
AP’s project-specific overall construction entry reports 100%, updated 2026-03-24. The current project information classifies the development as ready to move in. This dated completion report supersedes the brochure’s earlier January 2026 construction forecast; individual handover and availability remain with the provider.
Developer reports 100% overall progress; update 2026-03-24Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.