Bangkok · Din Daeng / Asok–Din Daeng Road

ASPIRE Vibha–Victory

ASPIRE Vibha–Victory is a Bangkok condominium development with 593 apartments and one separate retail unit. The 29-storey building on Asok–Din Daeng Road combines conventional apartments with Vertiplex layouts. The brochure separates simplex apartment areas from the smaller quoted floor areas of Vertiplex homes. The resident programme includes a swimming pool, fitness and work spaces, and shared sky lounge and rooftop garden areas. AP’s dated progress report records completion, and its current project information classifies the building as ready to move in.

Completed

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
AP Thailand
Location
Bangkok
Property types
One- and two-bedroom apartments, including Vertiplex layouts
Storeys
One 29-storey residential building
Residences
593 apartments and one separate retail unit
Land area
Approximately 4,283 m²
Unit sizes
Published simplex layouts: 26.5–60 m²; Vertiplex layouts: 26–46 m²
Announced completion
Developer reports 100% overall progress; update 2026-07-13

Planned amenities

  • Swimming pool
  • Gym and exercise areas
  • Co-working and work hub
  • Sky lounge
  • Sky park

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

ASPIRE Vibha–Victory

Bangkok

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Asok–Din Daeng Road, Din Daeng, Bangkok 10400. BTS Victory Monument is approximately 1.4 km away according to AP. Approximate official project-specific map point; checked against the project name and address, not a surveyed entrance.

03 · Development

Progress & timeline

Completed

AP’s project-specific progress data record 100% overall construction completion, updated 2026-07-13. The current project data classify the development as ready to move in; individual handovers and current availability remain with the provider.

Developer reports 100% overall progress; update 2026-07-13

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.