oyopo

Kuala Lumpur · Jalan Cochrane / Maluri

Sunway Cochrane

Sunway Cochrane is a two-tower serviced-apartment development along Jalan Cochrane. Its 1,296 residences sit above a mixed urban setting with retail at the base. The developer’s plans combine adaptable layouts with smart-home features and landscaped communal spaces. The proposed connection to Cochrane MRT is central to its transit-oriented concept, while the two towers and their shared podium form one distinct project, separate from Sunway Velocity 3.

Under construction

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
Sunway Cochrane Sdn Bhd / Sunway Property
Location
Kuala Lumpur
Property types
Serviced apartments with adaptable layouts
Storeys
TEDUH registers two residential components of 54 and 55 storeys
Residences
1,296; Tower A: 641, Tower B: 655
Land area
Approx. 21,850 m²
Unit sizes
Approx. 60–93 m²
Announced completion
Developer target: October 2029; TEDUH first-contract timetable: 19 November 2029

Planned amenities

  • Pool terrace
  • Gym
  • Children’s playground
  • Landscaped communal spaces
  • Sky dining spaces

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

Sunway Cochrane

Kuala Lumpur

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

The official project information describes a 60-metre link bridge to Cochrane MRT and nearby IKEA Cheras, MyTOWN and Sunway Velocity. Completion of individual connections is not independently confirmed.

03 · Development

Progress & timeline

Under construction

Official TEDUH record 8824-5 reports 20% for each of two residential components, covering 641 and 655 homes. No CCC or vacant-possession date is shown. The public response does not expose the component reporting month, so these readings are attributed to the register retrieved on 17 October 2026. The developer’s site photograph separately shows earthworks but is undated. October 2029 is the advertised target; the extended first-contract timetable ends on 19 November 2029.

Developer target: October 2029; TEDUH first-contract timetable: 19 November 2029

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.