oyopo

Bangkok · Thailand

ASPIRE Huai Khwang

ASPIRE Huai Khwang combines two residential towers with a separate parking building on Pracha Songkhrao Road. Its 1,274 homes are divided between the 34-storey Tower A and 35-storey Tower B.

Storeys
Residential A: 34 storeys; residential B: 35; parking C: 17
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The published layouts include one-bedroom, one-bedroom-plus and two-bedroom homes, with high-ceiling variants. Rooftop communal spaces are part of the developer’s concept, while the different building functions are kept separate in the project facts.

The project at a glance

Key project facts

Developer
AP Thailand
Location
Bangkok
Neighbourhood
Pracha Songkhrao / Din Daeng
Property types
One-bedroom, one-bedroom-plus and two-bedroom condominiums
Storeys
Residential A: 34 storeys; residential B: 35; parking C: 17
Residences
1,274 residences; 1 shop separately listed
Land area
Approx. 9,478 m²
Unit sizes
27–45 m²
Announced completion
September 2027, developer’s estimated completion in the brochure

Planned amenities

  • Rooftop communal facilities

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

AP lists MRT Huai Khwang approximately 750 metres away and the University of the Thai Chamber of Commerce approximately 550 metres away. Distances are developer figures.

Development

Progress & timeline

Under construction

AP reports 81.36% overall progress in its October 2026 update: structural work 99.90%, architecture 71.35%, and electrical and communication systems 69.85%. The developer’s brochure estimates completion in September 2027. This is a planning target, not a confirmed handover date or independent construction assessment.

September 2027, developer’s estimated completion in the brochure

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

AP Thailand

Sources & updates

Last checked: October 17, 2026

Official AP project details, October progress update and developer brochure reviewed on 17 October 2026. The brochure’s legal footer gives September 2027 as estimated completion; no confirmed handover date is stated. The project point remains separate from the sales gallery. Site area converted to m².