The Butterfly + First Baptist Church Complex

The Butterfly gives Vancouver’s skyline a rounded, cloud-like silhouette. Revery Architecture shapes the 57-storey residential tower with curved precast panels, glazing and deep balconies. The most interesting move lies inside: open-air sky gardens take the place of conventional enclosed residential corridors. The development brings new housing into a much older urban setting. First Baptist Church, originally completed in 1911, is restored and expanded alongside a separate seven-storey affordable rental building and community facilities. A transparent galleria connects the tower and church. A 50-metre pool has a sculptural roof formed by repeating concrete ribs. At street level, courtyards and the relationship between old masonry and the new tower add another scale to the project. The photographs show the built complex.

Completed

Researched by Oyopo
Last checked: October 19, 2026

01 · The project

Key project facts

Developer
Westbank Corp. and First Baptist Church of Vancouver
Location
Vancouver
Property types
Condominiums, affordable rental housing and community facilities
Storeys
57-storey tower; separate 7-storey rental building
Residences
Not yet confirmed
Land area
Not yet confirmed
Unit sizes
Not yet confirmed
Announced completion
2026 according to Revery; phased occupancy began earlier

Planned amenities

  • Open-air sky gardens
  • 50-metre swimming pool
  • Landscaped courtyards
  • Community facilities

These facilities are described in the project presentation. This does not confirm that they are already open for use.

02 · The location

Location & surroundings

The Butterfly + First Baptist Church Complex

Vancouver

Find address on map Address search opens OpenStreetMap.

The complex sits beside the historic First Baptist Church near Burrard and Nelson streets in downtown Vancouver. It combines a residential tower with a separate affordable rental building and renewed community spaces.

03 · Development

Progress & timeline

Completed

Revery’s current project page lists the development as Completed 2026. Occupancy occurred in phases: earlier coverage records residents moving in and describes tower completion in 2025. The 2026 date is the architect’s current project classification, not a claim that first occupation began in 2026.

2026 according to Revery; phased occupancy began earlier

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.