Aeon

Aeon is a 262-home apartment development in Dubai Creek Harbour’s Creek Beach area. The published collection includes one-, two- and three-bedroom homes, with shared leisure and wellness spaces designed around the waterfront setting.

Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The developer describes a clubhouse, exercise spaces and residents’ lounges, alongside access to the wider district’s promenade and landscaped public spaces. Those neighbourhood facilities are kept separate from the residential building’s own amenities.

The project at a glance

Key project facts

Location
Dubai
Neighbourhood
Creek Beach / Dubai Creek Harbour
Property types
One- to three-bedroom apartments
Residences
262 homes (Emaar H1 2026 register)
Unit sizes
Two-bedroom example, Tower 2 podium unit 07: 109.35 m² suite plus 10.42 m² balcony, 119.77 m² total; not a full project range
Announced completion
Current handover date not verified; dated construction progress shown below

Planned amenities

  • Swimming pool and leisure deck
  • Gym and wellness spaces
  • Residents’ lounges and games rooms
  • Landscaped shared spaces
  • Electric vehicle charging and bicycle parking

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Dubai Creek Harbour. Approximate project-area point from the developer’s project-specific map. Planned transport links and neighbourhood facilities are not represented as already delivered residential amenities.

Development

Progress & timeline

Under construction

Emaar’s H1 2026 investor presentation reports 86% construction completion as of June 2026 for 262 homes. This is the completion column, separate from the units-sold figure. It is not an October 2026 site measurement, individual handover confirmation or forecast of a specific completion day.

Current handover date not verified; dated construction progress shown below

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Emaar Properties

Sources & updates

Last checked: October 17, 2026

Project page, original brochure and Emaar’s H1 2026 investor presentation reviewed on 17 October 2026. Unit count and construction progress refer to the named project row on page 66. Approximate location uses the project-specific map label and coordinates, not a sales pavilion or masterplan centre. Large district land-area figures are not assigned to this project. The linked original plan gives a specific Tower 2 podium example; total area includes its balcony.