oyopo

Bangkok · Thailand

LIFE Charoennakhon–Sathorn

LIFE Charoennakhon–Sathorn is a 28-storey condominium on Charoen Nakhon Road between Soi 20 and Soi 22. Its 580 residences are distinct from the single commercial unit.

Storeys
One residential building, 28 storeys
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

Apartment layouts range from compact one-bedroom homes to two-bedroom plans, with additional high-ceiling variants. Communal spaces extend from gardens and the lobby to the upper floors, including a pool and fitness areas. The project sits in the Bang Lamphu Lang neighbourhood of Khlong San, with access towards Krung Thon Buri BTS and the Sathorn river crossing.

The project at a glance

Key project facts

Developer
AP Thailand
Location
Bangkok
Neighbourhood
Charoen Nakhon Road, Soi 20–22 / Bang Lamphu Lang, Khlong San
Property types
One-bedroom, one-bedroom-plus and two-bedroom condominiums
Storeys
One residential building, 28 storeys
Residences
580 residences; 1 commercial unit separately listed
Land area
Approx. 5,020 m²
Unit sizes
29.5–57 m²
Announced completion
Completed by August 2026, according to AP Thailand

Amenities & shared spaces

  • Swimming pool
  • Fitness centre
  • Landscaped gardens
  • Residents’ lounge
  • Rooftop communal spaces

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The developer identifies Krung Thon Buri BTS, Sathorn Pier, Sena Fest and ICONSIAM as nearby connections and destinations. Its project page gives differing station distances in different sections, so no single walking distance is asserted here.

Development

Progress & timeline

Completed

AP’s release dated 24 August 2026 describes this development and RHYTHM Charoennakhon Iconic as completed, with ownership transfers opening in August. This newer confirmation supersedes the older 97.87% progress entry on the project page. No exact physical completion date is specified.

Completed by August 2026, according to AP Thailand

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

AP Thailand

Sources & updates

Last checked: October 17, 2026

AP project details, project-map point and completion release dated 24 August 2026 reviewed on 17 October 2026. The newer completion announcement takes precedence over the older progress entry. The map uses the project location, separately identified from the sales gallery. Site area converted to m².