oyopo

Kuala Lumpur · Malaysia

The Vesta Residences

The Vesta Residences is a two-block residential project within SkySierra in Setiawangsa. Its 1,001 apartments are divided between 535 homes in Block A and 466 in Block B.

Storeys
Two residential blocks, 44 storeys each
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The developer publishes three layout sizes, ranging from two-bedroom homes to three-bedroom-plus arrangements. A shared podium and rooftop programme combine recreation, work and family spaces, including pool facilities, gardens and a gym. The profile covers Vesta specifically, rather than treating the wider SkySierra master development as a single apartment project.

The project at a glance

Key project facts

Location
Kuala Lumpur
Neighbourhood
SkySierra / Setiawangsa
Property types
Two-bedroom, three-bedroom and three-bedroom-plus apartments
Storeys
Two residential blocks, 44 storeys each
Residences
1,001; Block A: 535, Block B: 466
Land area
Approx. 11,300 m²
Unit sizes
Approx. 66–105 m²
Announced completion
Developer target: March 2027; TEDUH first-contract timetable: 10 April 2027

Planned amenities

  • Infinity swimming pool
  • Children’s pool
  • Play areas
  • Gym
  • Co-working space
  • Landscaped gardens
  • Rooftop communal spaces

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The official location plan places Vesta at SkySierra in Setiawangsa near AEON Mall AU2 and Bukit Dinding. The advertised MRT3 station is proposed, not an operating connection. The project website’s Google Maps link currently leads to a SkyWorld sales gallery in Bukit Jalil; it is excluded from the project coordinates.

Development

Progress & timeline

Under construction

TEDUH record 19840-2 reports 76.36% for the 535-home component and 76.37% for the 466-home component. Its overall classification is Lewat (delayed); the second component is also labelled delayed. No CCC or vacant-possession date is shown. The component reporting month is not exposed in the public response; readings were retrieved on 17 October 2026. The developer advertises March 2027, while the extended timetable for the first sale contract ends on 10 April 2027. Neither date confirms handover.

Developer target: March 2027; TEDUH first-contract timetable: 10 April 2027

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

SkySierra Development Sdn Bhd / SkyWorld Development

Sources & updates

Last checked: October 17, 2026

Official SkyWorld project facts, June 2026 report and Journal Vol. 5 for the approximately 11,300 m² Vesta site, separate from the wider SkySierra development. TEDUH project-status record 19840-2 for both 44-storey components, reported progress, delayed classification and first-contract timetable, retrieved 17 October 2026. Reporting month unspecified. Approximate map point excludes the gallery.