M Nova — Towers A/B

M Nova’s Towers A/B form a 1,248-home serviced-apartment release within the larger M Nova development in Kepong. The developer’s project disclosure lists 624 apartments in each tower. Advertised layouts cover two to four bedrooms, at approximately 65, 79 and 93 m². The wider scheme combines residential blocks with a retail podium and landscaped shared facilities. Its published programme includes parcel lockers, electric vehicle charging, automated waste collection and an e-hailing pickup point. This profile keeps the A/B release separate from the three-block masterplan and does not treat the larger site area as exclusive to these two towers.

Under construction

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
Mah Sing Group / Myvilla Development Sdn Bhd
Location
Kuala Lumpur
Property types
Two- to four-bedroom serviced apartments; shared retail podium
Storeys
Two towers in this release; verified storey count not available
Residences
1,248 for Towers A/B: 624 each; excludes any third residential block
Land area
Approx. 32,700 m² for the wider three-block M Nova site; not an A/B-only area
Unit sizes
Approx. 65, 79 and 93 m² for the advertised layout types
Announced completion
Phase-specific delivery date unresolved; developer sources give differing targets

Planned amenities

  • Landscaped facilities deck
  • Multi-tier security access
  • Electric vehicle charging
  • Parcel lockers
  • Dedicated e-hailing pickup point
  • Automated waste collection
  • Shared retail and food-and-beverage podium

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

M Nova — Towers A/B

Kuala Lumpur

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Kepong, Kuala Lumpur, near the MRR2 and the Taman Wahyu area. The developer gives approximately 1.9 km to Kepong Metropolitan Park and 3.1 km to Taman Wahyu KTM station. Approximate named M Nova site point from OpenStreetMap, checked against the official site-map context; the Lakeville sales gallery is not the project site.

03 · Development

Progress & timeline

Under construction

Mah Sing’s 2025 annual report lists M Nova as ongoing. The official site-progress gallery provides dated July 2026 photographs of the development and its surrounding works, reviewed on 17 October 2026. No percentage is published for this update. The report’s Q3 2026 project target differs from the A/B microsite disclosure’s February 2028 target; no confirmed A/B handover date or whole-project completion is asserted.

Phase-specific delivery date unresolved; developer sources give differing targets

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.