oyopo

Bangkok · Thailand

valles HAUS

A development of three seven-storey residential buildings and 408 homes in the T77 Community. Its concept combines shared green spaces with work and fitness facilities and areas for pets.

Storeys
7
Status
Under construction

Researched by oyopo · Last checked: October 15, 2026

The architectural story

The project in context

Lower-rise buildings and a separate clubhouse distinguish it from the central residential towers. Proposed amenities are presented as the developer’s description.

The project at a glance

Key project facts

Developer
Sansiri
Location
Bangkok
Neighbourhood
Phra Khanong / T77
Property types
Condominium apartments
Storeys
7
Residences
408
Land area
Approx. 9,600 m² (developer figure)
Unit sizes
Selected published plans: 34.25–34.50 m² (1A-1m pet-friendly layout) and 62.00–62.50 m² (2Am)
Announced completion
December 2026 (announced)

Planned amenities

  • Separate clubhouse
  • Co-working space
  • Fitness and Pilates
  • Swimming pool with children’s area
  • Hydrotherapy area
  • Pet park

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The developer places the project within the T77 Community near Phra Khanong and On Nut. An exact walking route to the BTS has not been independently verified.

Development

Progress & timeline

Under construction

October 2026 report: residential structures reach the seventh floor, with services and interiors well advanced and final quality checks ongoing. The report also mentions a two-storey Building D, without establishing it as a fourth residential building.

December 2026 (announced)

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Sansiri

Sources & updates

Last checked: October 15, 2026

Official Sansiri project page: facts, stated amenities and location. Official October 2026 construction report: reported progress and announced schedule. Map marker uses the centre of the developer’s embedded map: approximate location, not a surveyed building point. Additional project-specific dimensions, housing mix or delivery details checked against the official source on 15 October 2026. Selected plans and advertised units are not a full-development range.