M Luna is a two-tower serviced-apartment development in Kepong, beside the Kepong Metropolitan Park area. The project contains 1,672 homes, with two- to four-bedroom layouts advertised at approximately 65, 79 and 93 m². Mah Sing’s annual report identifies both towers as 57 storeys. The development combines family recreation spaces and a landscaped deck with multi-tier security, express parking ramps and electric vehicle charging. Its setting connects to the MRR2 and the wider Kepong road network. Mah Sing reports delivery in the fourth quarter of 2024 and records the development as fully sold; this profile does not advertise available units.

Completed

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
Mah Sing Group
Location
Kuala Lumpur
Property types
Two- to four-bedroom serviced apartments
Storeys
57 storeys in each of two towers (developer annual report)
Residences
1,672 residences across two towers
Land area
Approx. 22,100 m²
Unit sizes
Approx. 65, 79 and 93 m² for the advertised two-, three- and four-bedroom layouts
Announced completion
Delivered in Q4 2024, according to Mah Sing’s 2025 annual report

Planned amenities

  • Landscaped facilities deck
  • Swimming and family recreation spaces
  • Multi-tier security
  • Electric vehicle charging
  • Express car park ramps

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

M Luna

Kuala Lumpur

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Kepong / Jinjang, Kuala Lumpur, adjacent to the Kepong Metropolitan Park area and near the MRR2–Jalan Kuching network. The approximate point is the named M Luna residential site in OpenStreetMap, cross-checked against the developer’s project map and published neighbourhood. The Lakeville/Jalan Sibu sales gallery is a different place.

03 · Development

Progress & timeline

Completed

Mah Sing’s 2025 annual report explicitly classifies M Luna as completed and states delivery in Q4 2024. The 2024 report’s 63% vacant-possession figure was a historical handover reading and is not a construction percentage or today’s handover total. Completed status is supported by the completion report, not inferred from sold-out marketing.

Delivered in Q4 2024, according to Mah Sing’s 2025 annual report

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.