North Holland · Zuidas / Beethovenstraat
Valley
Valley is a completed residential mixed-use development in Amsterdam’s Zuidas district, developed by EDGE and designed by MVRDV. Three towers rise approximately 67, 81 and 100 metres around stone terraces and planting designed with Piet Oudolf. MVRDV and the residential operator describe 200 apartments. Offices, restaurants and public spaces complement the homes, including the elevated valley and Grotto atrium. The approximately 75,000 m² figure describes gross floor area across the development. First residents arrived in late 2021; the full public opening followed in September 2022.
Project photographs
Loading sends your IP address and technical connection data to api.mvrdv.com.
Loading sends your IP address and technical connection data to api.mvrdv.com.
Loading sends your IP address and technical connection data to api.mvrdv.com.
01 · The project
Key project facts
- Developer
- EDGE
- Location
- Amsterdam
- Property types
- Apartments within a mixed-use development with offices, restaurants and public spaces
- Storeys
- Not yet verified
- Residences
- 200 apartments, according to MVRDV and the residential operator
- Land area
- Not yet verified
- Unit sizes
- Approximately 55 m² to over 400 m² (residential operator)
- Announced completion
- First occupation late 2021; full public opening September 2022
Planned amenities
- Planted terraces and landscaped spaces designed with Piet Oudolf
- Public elevated valley on the fourth and fifth floors
- Public Grotto atrium and external stone stairways
From the project presentation; not confirmation that facilities are already usable.
02 · The location
Location & surroundings
Valley
Amsterdam
Loading sends connection data to OpenFreeMap.Beethovenstraat 301–781, 1083 HK Amsterdam, in the Zuidas district near Amsterdam Zuid station. The map marks the named Valley building footprint; it is an approximate project location, not a particular apartment entrance.
03 · Development
Progress & timeline
Completed. MVRDV records the arrival of the first residents and businesses in late 2021 and the full opening in September 2022. EDGE’s current portfolio separately lists Q1 2023 as completion. These are different reported milestones; no single apartment handover date or current availability is inferred.
First occupation late 2021; full public opening September 2022Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.