oyopo

Kuala Lumpur · Malaysia

Lofthill Residence

Lofthill Residence is a freehold serviced-apartment development on Jalan Raja Uda. The published layout collection includes standard apartments and dual-key options, allowing the project to offer different arrangements within the same building.

Storeys
51 storeys in TEDUH’s registered 653-home component
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

Its proximity to Raja Uda MRT shapes the location, while sky facilities provide communal spaces above street level. This profile keeps the developer’s advertised plans separate from confirmation of completed amenities or a final handover date.

The project at a glance

Key project facts

Developer
Armani Group
Location
Kuala Lumpur
Neighbourhood
Jalan Raja Uda / Kampung Baru
Property types
Serviced apartments; standard and dual-key layouts
Storeys
51 storeys in TEDUH’s registered 653-home component
Residences
653
Unit sizes
approx. 57–178 m²
Announced completion
27 August 2028 under TEDUH’s extended first-contract timetable; actual handover unconfirmed

Planned amenities

  • Sky pool
  • Sky gym
  • Sky terrace and lounge

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The project website places Lofthill on Jalan Raja Uda and advertises Raja Uda MRT approximately 60 metres away. That distance is a developer statement, not an independently measured walking route. The sales gallery is separate from the residential site.

Development

Progress & timeline

Under construction

TEDUH record 30641-1 reports 48.92% for the 653-home component, with no CCC or vacant-possession date. The public response does not identify the reporting month; this is a register reading retrieved on 17 October 2026, not a dated October progress measurement. The extended timetable for the first sale contract ends on 27 August 2028. Earlier myBina evidence records structural works verified on 30 September 2026.

27 August 2028 under TEDUH’s extended first-contract timetable; actual handover unconfirmed

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Armani Group

Sources & updates

Last checked: October 17, 2026

Armani’s corporate and project websites for the housing mix, layouts, amenities and location. Official TEDUH project-status record 30641-1 supplies the registered 51-storey component, progress reading and extended first-contract timetable; retrieved 17 October 2026. Shared facilities remain separately advertised on Levels 49 and 50. Approximate map point excludes the Jalan Inai gallery. No confirmed completion or current availability implied.