Singapore · Upper Thomson / Springleaf
Springleaf Residence
Springleaf Residence combines five new residential towers with the conserved former Upper Thomson Secondary School building. The 941-home development consists of 909 apartments in 25-storey towers and 32 apartments in the four-storey conserved building. The planned community spaces include four pools, sports courts and ten sky terraces. The retained school building adds study, fitness and creative rooms to the residential programme. Its setting beside forest and nature areas is complemented by access to Springleaf MRT on the Thomson-East Coast Line.
01 · The project
Key project facts
- Developer
- GuocoLand and Hong Leong Holdings
- Location
- Singapore
- Property types
- One- to five-bedroom condominiums
- Storeys
- Five 25-storey towers and a four-storey conserved building
- Residences
- 941 residences (909 in towers and 32 in the conserved building)
- Land area
- Approx. 32,024 m²
- Unit sizes
- Towers: approx. 49–137 m²; conserved building: approx. 36–117 m²
- Announced completion
- Estimated TOP H2 2029; contractual possession target 31 December 2031, both forecasts
Planned amenities
- 50 m lap pool and three additional pools
- Tennis court and half basketball court
- Ten sky terraces
- Gym and study / creative rooms
- Landscaped grounds and running track
- Community kitchen and multifunction rooms
From the project presentation; not confirmation that facilities are already usable.
02 · The location
Location & surroundings
Springleaf Residence
Singapore
Loading sends connection data to OpenFreeMap.Upper Thomson Road, beside the former Upper Thomson Secondary School and near Springleaf MRT. Approximate point for the named development area; it is not a surveyed tower entrance. The existing conserved school is not proof that the new towers are complete.
03 · Development
Progress & timeline
The developer lists this project as under development and publishes its design and forecast programme. A sufficiently dated, project-specific physical construction milestone was not established in the reviewed primary sources, so the current overall construction stage remains unconfirmed. Sales percentages, an appointed contractor and a mapped construction area are not used on their own to infer physical progress.
Estimated TOP H2 2029; contractual possession target 31 December 2031, both forecastsConstruction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.