Springleaf Residence

Springleaf Residence combines five new residential towers with the conserved former Upper Thomson Secondary School building. The 941-home development consists of 909 apartments in 25-storey towers and 32 apartments in the four-storey conserved building.

Storeys
Five 25-storey towers and a four-storey conserved building

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The planned community spaces include four pools, sports courts and ten sky terraces. The retained school building adds study, fitness and creative rooms to the residential programme. Its setting beside forest and nature areas is complemented by access to Springleaf MRT on the Thomson-East Coast Line.

The project at a glance

Key project facts

Location
Singapore
Neighbourhood
Upper Thomson / Springleaf
Property types
One- to five-bedroom condominiums
Storeys
Five 25-storey towers and a four-storey conserved building
Residences
941 residences (909 in towers and 32 in the conserved building)
Land area
Approx. 32,024 m²
Unit sizes
Towers: approx. 49–137 m²; conserved building: approx. 36–117 m²
Announced completion
Estimated TOP H2 2029; contractual possession target 31 December 2031, both forecasts

Planned amenities

  • 50 m lap pool and three additional pools
  • Tennis court and half basketball court
  • Ten sky terraces
  • Gym and study / creative rooms
  • Landscaped grounds and running track
  • Community kitchen and multifunction rooms

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Upper Thomson Road, beside the former Upper Thomson Secondary School and near Springleaf MRT. Approximate point for the named development area; it is not a surveyed tower entrance. The existing conserved school is not proof that the new towers are complete.

Development

Progress & timeline

Unknown

The developer lists this project as under development and publishes its design and forecast programme. A sufficiently dated, project-specific physical construction milestone was not established in the reviewed primary sources, so the current overall construction stage remains unconfirmed. Sales percentages, an appointed contractor and a mapped construction area are not used on their own to infer physical progress.

Estimated TOP H2 2029; contractual possession target 31 December 2031, both forecasts

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

GuocoLand and Hong Leong Holdings

Sources & updates

Last checked: October 17, 2026

Developer launch release, current project site and 1H FY2026 results reviewed on 17 October 2026. Advertised layout areas converted to approximate m². Estimated TOP is a development forecast; the later possession and legal-completion dates on the project site are separate contractual targets. Approximate named-project point matched in OpenStreetMap. No construction percentage invented.