Bangkok · Chom Phon / Chatuchak
LIFE Phahon–Ladprao
LIFE Phahon–Ladprao is a 598-home condominium on Phaholyothin Road in Bangkok’s Chatuchak district. Its published collection includes Simplex and Vertiplex layouts, with studios, one-bedroom, one-bedroom-plus and two-bedroom options within a brochure range of 28.5–65 m². The residential programme places swimming and fitness facilities on upper levels, alongside meeting rooms, lounges and rooftop planting. One retail unit and 283 parking spaces are listed separately. BTS Ha Yaek Lat Phrao and MRT Phahon Yothin serve the surrounding shopping and business district.
01 · The project
Key project facts
- Developer
- AP (Thailand) / AP ME 16 Co., Ltd.
- Location
- Bangkok
- Property types
- Studio, one-bedroom, one-bedroom-plus and two-bedroom condominiums
- Storeys
- Brochure: 40 storeys, plus 1 mezzanine and 1 basement; website counts 41 floors
- Residences
- 598 residences, plus 1 shop
- Land area
- Approx. 4,369 m²
- Unit sizes
- 28.5–65 m²; brochure range for Simplex and Vertiplex layouts
- Announced completion
- Developer reports 100% overall progress; exact handover date not verified
Planned amenities
- Sky lap pool and children’s pool
- Fitness and private gym spaces
- Co-working, meeting and social rooms
- Landscaped roof garden
- Lobby and residents’ lounges
- 283 car parking spaces
From the project presentation; not confirmation that facilities are already usable.
02 · The location
Location & surroundings
LIFE Phahon–Ladprao
Bangkok
Loading sends connection data to OpenFreeMap.996 Phaholyothin Road, Chom Phon, Chatuchak, Bangkok 10900. AP gives approximately 200 m to BTS Ha Yaek Lat Phrao and 550 m to MRT Phahon Yothin. Central Ladprao, Lotus’s and Union Mall are nearby; advertised distances are not independently measured routes.
03 · Development
Progress & timeline
AP reports 100% overall, structural, architectural and building-services progress and identifies the project as ready to move into. Progress entries were last updated on 25 November 2025; these timestamps do not establish individual handover dates. The brochure’s older April 2024 target is not presented as a confirmed completion date.
Developer reports 100% overall progress; exact handover date not verifiedConstruction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.