Faber Residence

Faber Residence is a low-rise condominium at Faber Walk in Clementi. Its 399 apartments are arranged across nine five-storey blocks beside Sungei Ulu Pandan, with two- to five-bedroom layouts in a published range of approximately 60–138 m². The design combines garden courtyards with swimming facilities and access to the adjoining park connector. Buildings are spaced to support natural light and ventilation. The future Jurong Town Hall MRT station is part of the surrounding transport plan and is not described as an operational station.

Unknown

Editorial research
Reviewed: October 17, 2026

01 · The project

Key project facts

Developer
GuocoLand, Hong Leong Holdings and TID
Location
Singapore
Property types
Two- to five-bedroom condominiums
Storeys
Nine five-storey blocks
Residences
399 residences
Land area
Approx. 25,800 m²
Unit sizes
Approx. 60–138 m² across two- to five-bedroom layouts
Announced completion
Estimated TOP H1 2029; contractual possession target 31 December 2030, both forecasts

Planned amenities

  • 50 m lap pool
  • Leisure pool, jacuzzi and wading pool
  • Landscaped gardens and courtyards
  • Direct access to Ulu Pandan Park Connector
  • 13 EV charging spaces and bicycle parking

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

Faber Residence

Singapore

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

Faber Walk, Clementi, beside Sungei Ulu Pandan. The approximate point is the named project area in OpenStreetMap, checked against the developer’s published Faber Walk site. The Lentor Hills Road showflat is not used as the project location.

03 · Development

Progress & timeline

Unknown

The developer lists this project as under development and publishes its design and forecast programme. A sufficiently dated, project-specific physical construction milestone was not established in the reviewed primary sources, so the current overall construction stage remains unconfirmed. Sales percentages, an appointed contractor and a mapped construction area are not used on their own to infer physical progress.

Estimated TOP H1 2029; contractual possession target 31 December 2030, both forecasts

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.