Bangkok · Ngamwongwan Road / Lat Yao / Chatuchak
Reference Kaset District
Reference Kaset District is a condominium development on Ngamwongwan Road in Bangkok’s Chatuchak district. Its VertiSpace homes use high ceilings and loft layouts, with base floor areas and illustrated additional use areas shown separately in the brochure. The current project brochure lists 381 homes in a 21-storey residential building, alongside a separate two-storey commercial building. Shared spaces include a pool, fitness areas, gardens and rooms for working and gathering. Kasetsart University and the Bang Khen rail station are nearby. The brochure names SC CD3 as the project and land owner; SC Asset presents and markets the development.
01 · The project
Key project facts
- Developer
- SC CD3 Co., Ltd. / SC Asset
- Location
- Bangkok
- Property types
- One-, two- and three-bedroom VertiSpace layouts
- Storeys
- Residential building: 21 storeys; separate commercial building: 2 storeys
- Residences
- 381 residences; 7 commercial units listed separately in the current brochure
- Land area
- Approx. 4,100 m²
- Unit sizes
- Quoted base areas approx. 24.5–35 m²; loft-use areas are illustrated separately
- Announced completion
- May 2027, estimated in the developer brochure; handover not confirmed
Planned amenities
- Swimming pool and children’s pool
- Fitness and yoga spaces
- Shared kitchen and lounges
- Landscaped gardens
- Parcel and laundry rooms
These facilities are described in the project presentation. This does not confirm that they are already open for use.
02 · The location
Location & surroundings
Reference Kaset District
Bangkok
Loading sends connection data to OpenFreeMap.The developer lists Kasetsart University at approximately 250 m, Vibhavadi Hospital at 260 m and the SRT Dark Red Line’s Bang Khen station at 500 m. Its stated distance to BTS Kasetsart University is 2.4 km; the nearby rail stations are not interchangeable.
03 · Development
Progress & timeline
SC Asset’s report dated 1 October 2026 records 67% overall construction progress: piling 100%, structure 98%, architecture 56% and building systems 39%. The brochure estimates completion in May 2027. These are dated developer figures and a target, rather than an independent inspection or confirmed handover date.
May 2027, estimated in the developer brochure; handover not confirmedThis is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.