Bangkok · Ngamwongwan Road / Lat Yao / Chatuchak

Reference Kaset District

Reference Kaset District is a condominium development on Ngamwongwan Road in Bangkok’s Chatuchak district. Its VertiSpace homes use high ceilings and loft layouts, with base floor areas and illustrated additional use areas shown separately in the brochure. The current project brochure lists 381 homes in a 21-storey residential building, alongside a separate two-storey commercial building. Shared spaces include a pool, fitness areas, gardens and rooms for working and gathering. Kasetsart University and the Bang Khen rail station are nearby. The brochure names SC CD3 as the project and land owner; SC Asset presents and markets the development.

Under construction

Researched by Oyopo
Last checked: October 18, 2026

01 · The project

Key project facts

Location
Bangkok
Property types
One-, two- and three-bedroom VertiSpace layouts
Storeys
Residential building: 21 storeys; separate commercial building: 2 storeys
Residences
381 residences; 7 commercial units listed separately in the current brochure
Land area
Approx. 4,100 m²
Unit sizes
Quoted base areas approx. 24.5–35 m²; loft-use areas are illustrated separately
Announced completion
May 2027, estimated in the developer brochure; handover not confirmed

Planned amenities

  • Swimming pool and children’s pool
  • Fitness and yoga spaces
  • Shared kitchen and lounges
  • Landscaped gardens
  • Parcel and laundry rooms

These facilities are described in the project presentation. This does not confirm that they are already open for use.

02 · The location

Location & surroundings

Reference Kaset District

Bangkok

Loading sends connection data to OpenFreeMap.
Approximate location from the project source map, not a surveyed building point. Open in OpenStreetMap

The developer lists Kasetsart University at approximately 250 m, Vibhavadi Hospital at 260 m and the SRT Dark Red Line’s Bang Khen station at 500 m. Its stated distance to BTS Kasetsart University is 2.4 km; the nearby rail stations are not interchangeable.

03 · Development

Progress & timeline

Under construction

SC Asset’s report dated 1 October 2026 records 67% overall construction progress: piling 100%, structure 98%, architecture 56% and building systems 39%. The brochure estimates completion in May 2027. These are dated developer figures and a target, rather than an independent inspection or confirmed handover date.

May 2027, estimated in the developer brochure; handover not confirmed

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.