oyopo

Navegantes · Brazil

Infinity Residence — Navegantes

Infinity Residence combines apartments with ground-floor commercial space in Meia Praia. The residential project is located on Avenida Osvaldo José Reiser in Navegantes.

Storeys
13 storeys
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The 13-storey scheme has four apartments per residential floor and three commercial units at ground level. Published private apartment areas range from 63.08 to 80.44 m²; a heated pool, gym, playroom and shared dining spaces form the amenity offer.

The project at a glance

Key project facts

Location
Navegantes
Neighbourhood
Meia Praia
Property types
Two-bedroom apartments, including one- and two-suite layouts
Storeys
13 storeys
Unit sizes
63.08–80.44 m² private apartment area
Announced completion
Developer target 2029

Planned amenities

  • Heated swimming pool
  • Party room
  • Shared gourmet kitchen and dining
  • Gym
  • Children’s playroom

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Avenida Osvaldo José Reiser, Meia Praia, Navegantes, near the seafront.

Development

Progress & timeline

Under construction

EFC’s project page reports 17% overall construction progress. Foundations are shown at 100%, while structure, masonry, installations, plastering and finishes are each shown at 0%. No measurement date is supplied. These are developer-reported readings retrieved on 17 October 2026; delivery remains forecast for 2029.

Developer target 2029

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

EFC Empreendimentos

Sources & updates

Last checked: October 17, 2026

Official developer sources reviewed 15 October 2026. Figures refer to this building or collection unless explicitly marked as shared, planned or neighbourhood provision. Additional project facts and cited source documents reviewed on 17 October 2026; advertised plans do not establish current availability. Approximate project-area point from the developer-linked map, checked 17 October 2026; not a surveyed building entrance.