oyopo

Kuala Lumpur · Malaysia

SkyAman 1 Residences

SkyAman 1 takes a more spacious approach to living in Cheras. A single residential tower brings family-sized layouts together with shared landscaped spaces.

Storeys
50
Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

Its focus is room for different stages of life, with gardens, a pool and fitness areas forming part of the proposed setting.

The project at a glance

Key project facts

Location
Kuala Lumpur
Neighbourhood
Desa Aman / Cheras
Property types
Condominium / serviced apartments
Storeys
50
Residences
510
Unit sizes
Standard types A/B/C: approximately 102–144 m²; P1 approximately 248 m² and P2 approximately 270 m²
Announced completion
Developer target: September 2029; TEDUH first-contract timetable: 21 February 2030

Planned amenities

  • Swimming pool
  • Gardens and communal decks
  • Gym

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

Desa Aman in Cheras, with Taman Mutiara MRT and Cheras Leisure Mall shown in the surrounding area. No exact walking time is guaranteed.

Development

Progress & timeline

Under construction

The developer website has construction updates through September 2026. TEDUH record 30976-1, retrieved on 17 October 2026, reports 5% for the 510-home component, but does not provide the reporting month in the public response. It is therefore not presented as a dated October measurement. The brochure targets September 2029; the register separately shows 21 February 2030 under the extended timetable for the first sale contract. Neither is a confirmed handover date.

Developer target: September 2029; TEDUH first-contract timetable: 21 February 2030

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

SkyAman Development Sdn Bhd / SkyWorld

Sources & updates

Last checked: October 17, 2026

SkyWorld project website and official May 2026 brochure for layouts, 510 homes, 50 storeys and advertised September 2029 target. TEDUH project-status record 30976-1 separately gives a 54-month first-contract timetable ending 21 February 2030 and an undated 5% component report; checked 17 October 2026. Map position remains approximate and separate from the Bukit Jalil sales gallery. Selected plan areas do not imply current availability.