oyopo

Mijas · Spain

Almare

Almare is a 48-home apartment development in La Cala de Mijas. Its published programme includes two-, three- and four-bedroom homes with terraces, supported by communal gardens, a swimming pool and an equipped gym.

Status
Under construction

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The original brochure provides individual layout drawings with interior, exterior and constructed areas identified separately. These measures are not interchangeable: a selected two-bedroom example is described in the project facts rather than using the sales table’s combined area as a whole-development apartment-size range.

The project at a glance

Key project facts

Developer
Metrovacesa
Location
Mijas
Neighbourhood
La Cala de Mijas
Property types
Two-, three- and four-bedroom apartments
Residences
48 homes
Unit sizes
Two-bedroom example, Block 1 / Entrance 1 / ground-floor B: 68.5 m² usable interior and 64.4 m² exterior; not a project-wide range
Announced completion
Construction start marked by the developer; completion and handover dates not verified

Planned amenities

  • Communal swimming pool
  • Landscaped gardens
  • Equipped gym
  • Outdoor rest and shared areas

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

La Cala de Mijas, Málaga, approximately 1 km from the beach according to Metrovacesa.

Development

Progress & timeline

Under construction

Metrovacesa’s current timeline marks construction start as active, with construction end and handover not yet active. The page does not supply a dated progress percentage or verified handover day.

Construction start marked by the developer; completion and handover dates not verified

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Metrovacesa

Sources & updates

Last checked: October 17, 2026

Current developer project page and project-specific map reviewed on 17 October 2026. Coordinates use the residential-development marker, not the sales-point marker or map-camera centre. The current timeline selection is distinguished from the full list of possible milestones. Exact handover dates and unverified whole-development area ranges are not inferred. Brochure page 24 separates usable interior/exterior from constructed area and common-area shares.