Bangkok · Phra Khanong / Khlong Toei
ASPIRE Sukhumvit–Rama 4
ASPIRE Sukhumvit–Rama 4 is a single-tower condominium on Rama IV Road in Bangkok’s Phra Khanong area. Its 1,323 homes range from studios to two-bedroom apartments, with advertised layouts of 24–55 m². Two shops form part of the scheme. A 25 m saltwater pool and planted outdoor spaces complement co-working rooms and exercise facilities. The project connects the Rama IV and Sukhumvit corridors, with BTS Phra Khanong around 600 m away according to the developer. The published plan includes 450 parking spaces.
01 · The project
Key project facts
- Developer
- AP (Thailand)
- Location
- Bangkok
- Property types
- Studio, one-bedroom and two-bedroom condominiums
- Storeys
- 38 storeys, one residential building (developer fact panel)
- Residences
- 1,323 residences, plus 2 shops
- Land area
- Approx. 7,823 m²
- Unit sizes
- 24–55 m²; developer-advertised layout range
- Announced completion
- Developer reports 100% overall progress; exact handover date not verified
Planned amenities
- 25 m saltwater swimming pool
- Hydro-fitness jets
- Co-working and meeting space
- Landscaped garden
- Cardio and exercise spaces
- 450 car parking spaces
From the project presentation; not confirmation that facilities are already usable.
02 · The location
Location & surroundings
ASPIRE Sukhumvit–Rama 4
Bangkok
Loading sends connection data to OpenFreeMap.On Rama IV Road, Phra Khanong subdistrict, Khlong Toei, Bangkok 10110. Developer-stated distances: approximately 600 m to BTS Phra Khanong and 1 km to Gateway Ekkamai; these are advertised distances, not independently measured walking routes.
03 · Development
Progress & timeline
AP’s project-specific data reports 100% overall, structural, architectural and building-services progress. The overall entry was last updated on 1 May 2026; that is a source-data update timestamp, not a verified completion or handover day. AP also identifies this project as ready to move into. Reviewed 17 October 2026; individual unit handovers are separate.
Developer reports 100% overall progress; exact handover date not verifiedConstruction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.