Concord Canada House adds two residential towers to CityPlace near the CN Tower and Rogers Centre. Its proposed high-level shared facilities and waterfront context make it an identifiable Toronto project, with delivery status kept separate for each tower.

Storeys
House 1: 69; House 2: 59 above-ground floors (CVU physical counts)
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The developer describes a SkyGym on level 71 and a SkyLounge on level 82. A level-ten outdoor space is designed to alternate between a summer reflective pool and winter skating rink. These are the marketed amenity locations; they do not establish the separate towers’ full floor counts or occupancy dates.

The project at a glance

Key project facts

Developer
Concord Adex
Location
Toronto
Neighbourhood
CityPlace / Spadina Avenue
Property types
Apartments / condominiums
Storeys
House 1: 69; House 2: 59 above-ground floors (CVU physical counts)
Announced completion
2025 for both towers, according to the Council on Vertical Urbanism

Amenities & shared spaces

  • Proposed level-71 SkyGym
  • Proposed level-82 SkyLounge
  • Proposed seasonal reflective pool / skating rink

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The towers are part of Concord CityPlace, next to the Rogers Centre and CN Tower in central Toronto. The presentation-centre address is not used as a building address.

Development

Progress & timeline

Completed

The Council on Vertical Urbanism records both Concord Canada House 1 and House 2 as completed in 2025. This is a building-completion record, not proof of each apartment’s occupancy approval or individual handover.

2025 for both towers, according to the Council on Vertical Urbanism

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Concord Adex

Sources & updates

Last checked: October 17, 2026

Official project/developer material reviewed on 15 October 2026. Physical progress, sales status and occupancy are distinguished in the progress note. Both towers’ completion years and physical floor counts checked against CVU on 17 October 2026. Advertised amenity-level numbers are not physical storey counts. Approximate complex-area point calculated between the two tower coordinates in CVU’s project map, reviewed 17 October 2026; not a surveyed entrance.