oyopo

Singapore

Norwood Grand

Norwood Grand introduces apartment living at Champions Way in Woodlands. Curved building forms and landscaped recreation areas shape the project, with a lap pool and tennis court included in the developer’s residential concept.

Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The scheme comprises 348 apartments, with residential leisure facilities arranged around landscaped outdoor areas. CDL describes a 50 m lap pool, tennis court and Cabana Garden. The legal expected vacant-possession date is 31 March 2030; that contractual milestone is distinct from legal completion.

The project at a glance

Key project facts

Location
Singapore
Neighbourhood
Champions Way, Woodlands
Property types
One-bedroom-plus-study to four-bedroom-plus-study apartments
Residences
348
Unit sizes
Approximately 46–124 m² across the advertised one-bedroom-plus-study to four-bedroom-premium-plus-study layouts
Announced completion
TOP obtained August 2026, according to CDL

Amenities & shared spaces

  • 50-metre lap pool
  • Gym and tennis court
  • Residents’ clubhouse and function room
  • Barbecue pavilions
  • Treetop walk and children’s playground

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The development is on Champions Way in Woodlands. Its northern Singapore setting is linked to the Thomson–East Coast Line; future economic development in the area is not an existing on-site facility.

Development

Progress & timeline

Completed

CDL’s September 2026 update marks all building-work categories complete and TOP obtained in August 2026. The older March 2030 vacant-possession deadline is not the actual completion date.

TOP obtained August 2026, according to CDL

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

CDL Stellar / City Developments Limited

Sources & updates

Last checked: October 17, 2026

CDL’s official 1 October 2024 launch release documents 348 homes, the advertised layout range, facilities and Champions Way location. CDL’s separate construction page supplies the August 2026 TOP evidence retained in the progress note. Launch figures describe the project programme, not current availability; the sales gallery on Sembawang Vista is separate from the site. Additional project facts and cited source documents reviewed on 17 October 2026; advertised plans do not establish current availability.