oyopo

Melbourne · Australia

Voyager at Yarra’s Edge

Voyager is a completed 43-level residential tower in the Wharf’s Entrance precinct at Yarra’s Edge, Melbourne. Mirvac’s community history records 310 apartments and completion in 2021.

Storeys
43 levels
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The building stands at 103 South Wharf Drive in Docklands.

The resident programme places shared social space at the top of the tower, with a rooftop retreat, indoor and outdoor dining, a lounge with a fire pit, and a cinema and karaoke room. The surrounding precinct includes the riverside promenade, public green space and the separate Wharf Club recreation building.

The project at a glance

Key project facts

Developer
Mirvac
Location
Melbourne
Neighbourhood
Docklands / Wharf’s Entrance
Property types
Residential apartments
Storeys
43 levels
Residences
310 apartments (Mirvac community project description)
Announced completion
2021, according to Mirvac’s community precinct history

Amenities & shared spaces

  • Rooftop sky garden and retreat
  • Indoor and outdoor dining spaces
  • Rooftop bar and lounge
  • Outdoor lounge with fire pit
  • Cinema and karaoke room

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

103 South Wharf Drive, Docklands, Melbourne. Address corroborated by Mirvac’s own property service and matched to an OSM address point. Approximate address-area point, not a surveyed building footprint. Wider Yarra’s Edge parkland is not assigned as Voyager’s private land.

Development

Progress & timeline

Completed

Mirvac’s Yarra’s Edge precinct history explicitly records Voyager completed in 2021. The broader Yarra’s Edge regeneration continues with other towers and is not assigned Voyager’s completed status. The FY25 investment register’s construction-cost and settlement columns are kept separate from the residential completion history.

2021, according to Mirvac’s community precinct history

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Mirvac

Sources & updates

Last checked: October 17, 2026

Current Mirvac precinct history records Voyager completed in 2021 with 310 apartments across 43 levels. Mirvac’s Summer 2022 magazine supplies the rooftop amenity programme. FY25 investment register counts 315 project lots; these are not substituted for the explicitly stated residential count of 310 apartments. Mirvac’s property service corroborates 103 South Wharf Drive; OSM address point matched. Reviewed 17 October 2026.

Design questions, real projects

Buildings, compared and explained

All design guides

From the planted balcony to the neighbourhood plan: follow an idea across the spaces people use, with sources and questions for a closer look.