oyopo

Wellington · New Zealand

Victoria Lane Apartments

Victoria Lane Apartments is a completed mixed-use development at 161 Victoria Street in Wellington’s Cuba Quarter. Willis Bond records 123 apartments on levels 4–16, with offices below and retail at ground level.

Storeys
Apartments on levels 4–16; offices on levels 1–3 and ground-floor retail
Status
Completed

Researched by oyopo · Last checked: October 17, 2026

The architectural story

The project in context

The developer reports completion in March 2023 and describes the original residential development as fully sold.

The project was developed with Athfield Architects and LT McGuinness. Its structural design incorporates base isolation and a diagonal steel framework. An adjoining low-rise parking building serves both the apartments and commercial occupiers. This is a record of the completed development, with no claim that original new-build apartments remain available.

The project at a glance

Key project facts

Developer
Willis Bond
Location
Wellington
Neighbourhood
Te Aro / Cuba Quarter
Property types
Residential apartments above office and retail space
Storeys
Apartments on levels 4–16; offices on levels 1–3 and ground-floor retail
Residences
123 apartments
Announced completion
March 2023 (developer-reported completion); original development fully sold

Amenities & shared spaces

  • Adjoining car-parking building serving residential and commercial occupiers

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

161 Victoria Street, Te Aro, Wellington, in the Cuba Quarter. The official project address matches the OSM address point. Approximate building-area location, not a surveyed entrance; nearby commercial precinct stages are separate developments.

Development

Progress & timeline

Completed

Willis Bond’s current project record states that Victoria Lane Apartments was completed in March 2023 and is fully sold. Completion of this residential building is separate from subsequent neighbouring commercial stages in the wider Cuba Precinct.

March 2023 (developer-reported completion); original development fully sold

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Willis Bond

Sources & updates

Last checked: October 17, 2026

Official Willis Bond project record reviewed 17 October 2026: March 2023 completion, 123 apartments, fully sold status, exact address, floor allocation, project team and structural features. Base isolation is described as a design feature, not an independent earthquake-safety guarantee. No unverified private pool, gym or apartment-size range added.