Singapore · Kim Seng Road / Zion Road

Zyon Grand

Zyon Grand combines residences with a direct connection to Havelock MRT. Retail, food outlets and a separate long-stay serviced-apartment component form part of the integrated development, offering a different scale of urban living from a standalone condominium. CDL and Mitsui Fudosan’s joint venture proposes 706 apartments in two 62-storey towers. The integrated scheme separately includes Zyon Galleria, an early-childhood centre and a 36-storey long-stay serviced-apartment building. The private home mix runs from one-bedroom plus study to five-bedroom apartments and penthouses.

Under construction

Editorial research
Reviewed: October 15, 2026

01 · The project

Key project facts

Developer
CDL / Mitsui Fudosan
Location
Singapore
Property types
1-bedroom + study to 5-bedroom apartments; penthouses
Storeys
Two private residential towers of 62 storeys; separate serviced-apartment block
Residences
706 private apartments; serviced apartments excluded
Land area
Approx. 15,278 m², entire integrated development
Unit sizes
Approx. 44–169 m² ordinary layouts; penthouses approx. 247–256 m²
Announced completion
Expected vacant possession: 30 September 2032; expected legal completion: 30 September 2035 — developer forecasts

Planned amenities

  • Planned direct link to Havelock MRT
  • Planned restaurants and supermarket
  • Planned early childhood development centre

From the project presentation; not confirmation that facilities are already usable.

02 · The location

Location & surroundings

Zyon Grand

Singapore

Find address on map Address search opens OpenStreetMap.

The site is at 3 and 5 Kim Seng Road, with a planned direct connection to Havelock MRT. The approximately 15,278 m² land figure covers the entire integrated development.

03 · Development

Progress & timeline

Under construction

CDL’s September 2026 report records foundation and structural work in progress. Residential and serviced-apartment components must remain distinct.

Expected vacant possession: 30 September 2032; expected legal completion: 30 September 2035 — developer forecasts

Construction status reflects the cited information at the time of review. Individual buildings, amenities and handovers may follow different schedules.