oyopo

Melbourne · Australia

Trielle at Yarra’s Edge

Trielle introduces a residential tower to Yarra’s Edge. Its riverfront position and proposed spaces for fitness, working and shared meals provide an editorial focus on how high-rise homes relate to Melbourne’s established Docklands waterfront.

Storeys
45
Status
Under construction

Researched by oyopo · Last checked: October 15, 2026

The architectural story

The project in context

The developer describes a 45-level tower with one- to four-bedroom residences. Its proposed amenity programme includes the Oasis wellness club, dedicated work pods, a library and shared entertaining rooms. Optional fit-out upgrades and depicted furnishings are not standard inclusions.

The project at a glance

Key project facts

Developer
Mirvac
Location
Melbourne
Neighbourhood
Docklands / Yarra’s Edge
Property types
1–4 bedroom apartments
Storeys
45
Announced completion
2027, developer target

Planned amenities

  • Planned 25 m lap pool and wellness club
  • Planned gym and yoga / Pilates room
  • Planned library and work pods
  • Planned private dining room
  • Planned cinema and games spaces

These facilities are described in the project presentation. Please check their current status with the provider.

The setting

Location & surroundings

The site is on the Yarra’s Edge promenade in Docklands. Riverfront paths and the established residential precinct form its immediate setting.

Development

Progress & timeline

Under construction

A September 2026 Mirvac announcement confirms topping out. Structural completion does not establish finished apartments or occupancy; the developer’s construction update targets 2027.

2027, developer target

This is the building progress described by our sources when we last checked. Different buildings, shared facilities and handovers may have different timelines.

Explore the architecture. Consider the possibilities.

Interested in this project?

For current availability, prices and handover details, contact the project provider directly.

Mirvac

Sources & updates

Last checked: October 15, 2026

Official project/developer material reviewed on 15 October 2026. Physical progress, sales status and occupancy are distinguished in the progress note. Additional fact sources: https://trielle.mirvac.com/news-and-events/news/trielle-sod-turn; https://trielle.mirvac.com/amenity-and-wellness.

Design questions, real projects

Buildings, compared and explained

All design guides

From the planted balcony to the neighbourhood plan: follow an idea across the spaces people use, with sources and questions for a closer look.