Buying off the plan in Melbourne

Buying an apartment off the plan in Melbourne? See what to check before signing, how to budget for stamp duty and settlement, and what to inspect before handover.

Reviewed 11 min read

Two buyers reviewing an apartment floor plan at a kitchen island
An apartment display suite can help you visualise finishes and layout. Ask which details apply to the home you are considering.

What to check at a Melbourne apartment display suite

Ask for the lot number, level, current floor plan and finishes schedule before you visit. The marketing apartment number may differ from the lot number on the proposed subdivision plan. Ask the agent to show how the two relate, especially if you are also buying a separately identified car space or storage cage. Save the revision date on each drawing so you can spot later changes.

Start with the north arrow and the apartment’s position on the floor plate. A window looking out over a street can have a different outlook from one facing an internal light well. Trace the route from the lift to the front door, then check whether the bedroom, laundry and entry have enough clearance for the way you live. Ask which floor area figures cover interiors, balcony and storage.

At the display suite, compare the cabinetry, appliances, flooring and bathroom fittings with the written inclusions. Ask whether the suite represents your layout and orientation. Note any upgrades shown and request the actual finish specification. For anything that influences your decision, ask your conveyancer or solicitor to confirm which plan and specification are incorporated into the contract.

  • Can I see the floor plate with my apartment marked, as well as the plan of my apartment?
  • Which fittings in this room are standard for my lot, and which are upgrades?
  • How are the parking space and storage shown in the sale documents?
  • What is proposed on adjacent sites, and where can I check that independently?

A Melbourne example: The Albertine

Mirvac reports that construction of The Albertine, a 98-apartment development near Albert Park, finished in April 2026. Its original pre-construction floor plan for apartment 203 shows how a buyer could locate a specific home within the building between Queens Road and Queens Lane. The drawing treats its dimensions and areas as approximate.

With that plan in hand, a buyer could ask which side of the building the living area faces and how its outlook is affected by the floor level. For a finished home, a visit can help answer those questions. For an apartment still being built, ask what the latest contract plans show and record what you still need confirmed. Apartment 203 is a historical example of reading a plan.

The marketing plan shows about 55 m² inside and about 10 m² of balcony for this one-bedroom home, rounded from the developer’s figures. Parking and external storage are outside that area calculation. For a useful comparison with another apartment, write down those areas separately and ask how the developer measured each. Then check whether the balcony has enough usable depth for your furniture. Mirvac’s drawing is an example of what can be checked before construction. Its measurements remain subject to the final survey.

Section 32 and contract checklist before signing

Ask for the Section 32 vendor’s statement and the complete contract pack. The Section 32 is a seller disclosure about matters such as title, easements, planning controls and outgoings. Check it alongside the proposed plan of subdivision, the lot plan and the special conditions so you can match the home being marketed to what the buyer is agreeing to purchase.

Send the complete pack to a Victorian conveyancer or property solicitor before committing. Point out anything that made you choose this apartment, such as a particular outlook, storage cage or occupancy timeframe. Ask your adviser to mark the clauses that deal with layout changes, substitutions, finance, extensions, notices and settlement. Keep the signed version and every later variation in one place.

If the floor plan changes during construction, save the original and revised drawings. Compare usable room dimensions, openings and external areas, and note when the notice arrived. Where a change to the plan of subdivision materially affects the lot, the Sale of Land Act sets a short response window. Ask your adviser promptly what applies to that notice and what options the contract and legislation give you.

How much is an off-the-plan deposit in Victoria?

For an off-the-plan lot covered by Victoria’s Sale of Land Act, the deposit is negotiable up to 10% of the purchase price. Ask your adviser to confirm when each amount is due and who will hold it. For a sale before registration of the subdivision plan, the Act requires the deposit to be held in trust until the plan is registered. Ask how any initial reservation payment is treated and whether it counts towards the total deposit.

On an illustrative AUD 750,000 contract with a 10% deposit, the deposit is AUD 75,000 and the balance of the purchase price is AUD 675,000 before adjustments. Keep the balance, duty, other settlement costs and moving expenses on separate lines. Use the actual terms in your contract when replacing the example figures.

Financing can change while the building goes up. Ask your lender when it will reassess your income and the property value. If the lender values the finished apartment below the price you agreed, your available loan may be smaller than expected. Ask the lender to explain how much cash you would need under a lower valuation and have your adviser check whether your contract has an applicable finance condition.

What does a sunset clause mean when buying off the plan?

The developer’s estimated completion month helps you plan a move. Your contract and the law govern the deadlines and the consequences of missing them. Record three things separately: the estimated construction completion, the time allowed for plan registration or issue of an occupancy permit where relevant, and how the settlement date will be set once the required events occur.

Consumer Affairs Victoria says a purchaser can end an off-the-plan sale if the subdivision plan is not registered within the contractual period, or within 18 months if the contract specifies no other period. Have your adviser check which period applies and how to exercise any right. A delayed marketing date on its own tells you very little about that deadline.

Victoria’s Sale of Land Act restricts a vendor’s ability to end a residential off-the-plan contract using a sunset clause. If a developer requests written consent to end the contract or proposes an extension, ask your adviser to explain the legal effect before you respond. Keep a copy of the notice, the date it arrived and any response deadline.

How does the off-the-plan stamp duty concession work in Victoria?

Victoria calls stamp duty land transfer duty. The temporary off-the-plan concession can reduce the dutiable value of eligible new apartments and townhouses in strata subdivisions with common property. The State Revenue Office uses the contract date for the temporary scheme. The current window runs from 21 October 2024 through 20 April 2027 inclusive. Settlement can occur later.

The calculation generally deducts eligible construction costs incurred on or after the contract date from the dutiable value. For example, if the starting value is AUD 750,000 and the eligible construction deduction is AUD 250,000, the reduced dutiable value is AUD 500,000. The deduction changes the amount on which duty is calculated. Ask the conveyancer to confirm the actual duty and obtain the developer’s calculation.

Two homes advertised at the same price may produce different estimates if the remaining construction differs. Ask for the estimate for your lot and your signing date. The temporary concession applies to general land transfer duty. If foreign purchaser additional duty is relevant to you, ask for it to be calculated separately on the applicable basis.

Owners corporation fees in Victoria: what to compare

In an apartment building, the owners corporation manages common property. Its fees can pay for insurance, maintenance and administration. Check the amount for the exact lot, what the annual budget covers and whether contributions to a maintenance fund are included. Express each estimate as an annual amount so a quarterly quote is easy to compare with a yearly figure.

For an off-the-plan apartment, ask for the proposed budget and which assumptions are provisional. Check how charges are allocated to your lot and whether the agent has included any separate parking or storage lot. When looking at a completed apartment, ask for the owners corporation certificate and available records covering current fees, special levies, insurance and planned work.

If one building includes a pool, multiple lifts or staffed reception, ask what its estimate includes for operating and maintaining those facilities. Look at the fees alongside your expected use. A short list of the actual operating costs and upcoming works tells you more than a sticker price per quarter.

Off the plan vs a completed apartment in Melbourne

Compare the two options at the same level of detail. For the completed home, visit the actual apartment and check its title documents and owners corporation records. For the off-the-plan option, identify the drawings and specifications that you can rely on, then list the remaining uncertainties with who can answer them.

Put total cash needed by settlement, annual ownership costs and your latest workable move date side by side. A longer lead time is easier to accommodate if you can extend your current accommodation. If a move date matters for a lease or school term, work out what a delay would cost before deciding which option suits you.

Compare the evidence available at each stage
What to checkOff the planCompleted apartment
Light and outlookConfirm the level, orientation and likely obstructions on the site plan.Visit the specific apartment and look out from the rooms you use most.
FinishesCheck the schedule for the apartment and which variations are agreed.Inspect the installed finishes and ask which fittings are included.
Move dateCompare the developer’s current estimate with the contract milestones.Ask when the apartment can settle and when you can collect the keys.

Pre-settlement inspection checklist for a new apartment

Arrange the final inspection with the agent. Consumer Affairs Victoria describes the buyer’s final inspection during the week before settlement. Check your contract for the notice and inspection arrangements that apply to the new apartment. Bring the signed floor plan, finishes schedule and written variations, and ask in advance which services will be connected so you know what can be tested.

Work through the checklist room by room. Photograph anything incomplete or damaged and record the room, exact location and contract item. For example, “bedroom two, window beside wardrobe, latch does not engage” gives the agent and your adviser something they can identify on a return visit.

Send the record to your conveyancer or solicitor promptly. Ask which issues should be raised before settlement, how outstanding items will be recorded and who will follow up after handover. Confirm settlement timing, keys and access passes before relying on a booked removalist or move-in slot.

  • Entry and living areas. Check agreed floor finishes, lights, door locks, windows, latches and any installed blinds.
  • Kitchen. Match appliances and finishes to the schedule. Where services are on and testing is permitted, check taps, drainage, extractor and appliance controls.
  • Bathroom and laundry. Check visible seals, ventilation, doors and taps. Note any leak, standing water or connection you cannot inspect.
  • Bedrooms and balcony. Open wardrobe doors and accessible windows, and check balcony thresholds and the agreed fittings.
  • Parking, storage and access. Locate the spaces identified in the sale documents. Confirm the keys, fobs, intercom and any move-in procedure.

Questions to take with you

  • Before signing, request the Section 32 statement, complete contract and current plans for the apartment, parking and storage.
  • Match display-suite finishes to the written inclusions and check how later substitutions or design changes are handled.
  • Confirm your deposit, how it will be held, finance timing and the deadlines that affect your options.
  • Budget for duty, settlement cash, owners corporation fees and accommodation if the project runs late.
  • Bring the agreed documents to the final inspection and give your adviser a room-by-room issue list.
How this guide was prepared

oyopo combines original architectural analysis with published information from architects and project teams. Sources identify the basis for project facts. The review date records the latest content check; design intentions and proposed facilities are distinguished from completed work. These articles are not site inspections or independent performance assessments.

Sources and further reading

Consumer Affairs Victoria: Buying off-the-planVictorian guidance on contracts, deposits and risks.

Mirvac: The AlbertineDeveloper report on completion and the development’s 98 apartments.

Mirvac: The Albertine apartment 203 floor planOriginal pre-construction marketing plan used here as a historical example.

State Revenue Office Victoria: temporary off-the-plan concessionCurrent Victorian eligibility and contract dates.

Consumer Affairs Victoria: SettlementFinal inspection, transfer and possession.

Consumer Affairs Victoria: Section 32 and contract disclosuresRequired seller disclosures and what the vendor’s statement covers.

Victorian legislation: Sale of Land Act 1962See sections 9AA, 9AC, 9AE and 10A to 10E for deposits, subdivision changes, delay and residential sunset clauses.

Consumer Affairs Victoria: Buying an apartment or unitOwners corporation records, lot costs and common property.

Consumer Affairs Victoria: Owners corporation feesAnnual fees, maintenance funds and extraordinary charges.

Consumer Affairs Victoria: Before property settlementFinal inspection timing and checks.